定,將軸承體壓蓋用固定螺釘緊固。

    4、裝上填料、放好中開面紙墊、蓋上泵蓋、擰緊螺尾錐銷后,擰緊泵蓋螺母,最后裝上填料壓蓋。不要將填料壓得太緊,填料過緊會使軸套發(fā)熱,同時耗用功率大;也不要壓得太松,填料過松液體滲漏大,水泵效率降低,所以應在運行時予以調節(jié)。

    裝配完成后,用手轉動泵軸,沒有擦碰現(xiàn)象,轉動比較輕滑均勻即可。

    拆卸可按上述裝配順序相反地進行。

四、安    裝

    1、檢查水泵和電機應無損壞:

    2、水泵的安裝首先要滿足裝置汽蝕余量NPSHa大于泵的必須汽蝕余量NPSHr,使泵在運行時不發(fā)生汽蝕;A尺寸應符合泵機組的安裝尺寸。

    3、安裝順序:

    (1)、將水泵放在埋有地腳螺栓的混凝土基礎上,用調整其間的楔形墊塊的方法校正水平,并適當擰緊地腳螺栓,以防走動;

    (2)、在基礎與泵底腳之間灌注混凝土:

    (3)、待混凝土干固后,擰緊地腳螺栓,并重新檢查水泵的水平度;

    (4)、校正電動機軸與水泵軸的同心度,使兩軸成一直線,在兩聯(lián)軸器外圓上的不同心度允差為0.1毫米,端面間隙沿圓周的不均勻允差為03毫米(在聯(lián)接進出水管路及試運行后再分別校核一遍,仍應符合上述要求);

    (5)、在檢查電動機轉向與水泵轉向符

circle of the impeller seal position and the sleeve excircle on the rotor partwhich is not allowed to exteed its provisions as following

Norminal

Diameter

<50

 

>50

120

>120

260

>260

500

>500

800

>800

1250

Beats

0.05

0.06

0.08

0.10

0.12

0.16

    3. Assemble the rotor part and studs on the pump casing and well install the bearing gland and tighten it with bolls,  then you can adjust the axial position of the impeller with shaft sleeve nuts up to middle flow passage way of the pump casing and tighten it.

    4. Feed the packing into the packing box. Place the horicental joint paper gasket,  cover the pump, hammar(or other things)  the taper pin with exteral thread tightly, the following, screw its unts aud mount the packiug gland which degree of the packing tightness must be suitable  (if too light,  the shaft sleeve would be over heated,  samely more power would be consumed; if too loose, the leakage of liquid would be found from here,  and thus would decrease the pump efficiency. )

    After finishing assembling the pump,  turn the rotor with hands, it should be flexible and smooth as well as no block and no rubbing. That is OK! and then you can operate it freely.

    (Disassemble it according to the opposite order of assembling)

Ⅳ. Installation

    1. Check whether the pump and the motor are in good condition.

    2. Make sure that the value of NPSH is higher than the one that have been given, and its fouudation dimensions should be in comformity with the installation drawing.

    3. The steps of installation:

    (1) Sleeve the foot bolts and hat the nuts on the pump and the motor,  place the pump on the concret foundation where some foot bolt holes are pre -built, correct the horizontal and the coaxial degree between

亚洲av无码国产综合专区,色翁荡息又大又硬又粗又爽,精品国产SM捆绑最大网免费站,精品亚洲成在人线av无码 新巴尔虎左旗| 叙永县| 洛阳市| 炎陵县| 年辖:市辖区| 龙游县| 衡阳县| 龙川县| 宜兰县| 贵南县| 黎城县| 宁武县| 亳州市| 武宁县| 武宁县| 贡山| 昌图县| 库伦旗| 安塞县| 临颍县| 红原县| 文山县| 邢台市| 巫溪县| 房产| 东辽县| 确山县| 互助| 朝阳县| 张家口市| 吉木乃县| 沈阳市| 双桥区| 鲜城| 怀宁县| 武清区| 沁阳市| 洪湖市| 宁陵县| 信宜市| 兴宁市|